Tower roof repair
TOWER ROOF REPAIR PROJECT
Over the last year or so, significant water ingress has been noted in the church tower. The five-yearly inspection carried out in 2023 by our architect identified decay and rot in the roof timbers, confirmed by a specialist surveyor. The cause seems to be inadequate rainwater run-off arrangements at the top of the tower, combined with blocked gutters and defective gutter joints.
A structural engineer has inspected the timbers and prepared a report, and our quantity surveyor has provided detailed costings of the work required, which is estimated at £187,000, including contingencies and overheads, plus professional fees at around £37,400.
The necessity of raising funds and carrying out the repairs means that the other improvements proposed under our Five-Year Plan are likely to be delayed. The tower work is provisionally scheduled to be undertaken in Spring/Summer 2025. It is hoped that grants can be obtained towards this important work on our Grade I listed building to supplement the money in our own building fund and the hoped-for contribution from the Friends of Steyning Parsh Church.
A public appeal will be launched this year – in the meantime please see here for how to make a donation to the Parish Church of St Andrew and St Cuthman in Steyning.