TOWER ROOF REPAIR PROJECT
Over the last year or so, significant water ingress has been noted in the church tower. The five-yearly inspection carried out in 2023 by our architect identified decay and rot in the roof timbers, confirmed by
TOWER ROOF REPAIR PROJECT
Over the last year or so, significant water ingress has been noted in the church tower. The five-yearly inspection carried out in 2023 by our architect identified decay and rot in the roof timbers, confirmed by a specialist surveyor. The cause seems to be inadequate rainwater run-off arrangements at the top of the tower, combined with blocked gutters and defective gutter joints.
A structural engineer has inspected the timbers and prepared a report, and our quantity surveyor has provided detailed costings of the work required, which is estimated at £187,000, including contingencies and overheads, plus professional fees at around £37,400.
The necessity of raising funds and carrying out the repairs means that the other improvements proposed under our Five-Year Plan are likely to be delayed. The tower work is provisionally scheduled to be undertaken in Spring/Summer 2025. It is hoped that grants can be obtained towards this important work on our Grade I listed building to supplement the money in our own building fund and the hoped-for contribution from the Friends of Steyning Parsh Church.
A public appeal will be launched this year – in the meantime please see here for how to make a donation to the Parish Church of St Andrew and St Cuthman in Steyning.